Construction guide

Thirteen stages, from bare land to handover

Open a stage to see the work involved and order its materials.

Stage 1

Land and preparation

Clear the plot, mark the footprint and excavate.

Stage 2

Foundation and footing

Pour footings and foundation walls on firm ground.

Stage 3

Ground slab

Lay hardcore, damp-proofing and the reinforced slab.

Stage 4

Walls and structural work

Raise block walls and columns course by course.

Stage 5

Lintels and beams

Cast lintels over openings and ring beams.

Stage 6

Roof structure

Fit the timber frame on the ring beam.

Stage 7

Roofing and zinc

Fix sheets, ridge and flashing.

Stage 8

Plumbing and electrical

Run conduits and pipes before plastering.

Stage 9

Plastering

Render walls inside and out.

Stage 10

Flooring and tiling

Screed, then lay tiles.

Stage 11

Doors and windows

Fit frames, doors and glazing.

Stage 12

Paint and finishing

Prime, paint and fit fixtures.

Stage 13

Final inspection and handover

Check every stage and sign off.