Construction guide
Thirteen stages, from bare land to handover
Open a stage to see the work involved and order its materials.
Stage 1Land and preparation
Clear the plot, mark the footprint and excavate.
Stage 2Foundation and footing
Pour footings and foundation walls on firm ground.
Stage 3Ground slab
Lay hardcore, damp-proofing and the reinforced slab.
Stage 4Walls and structural work
Raise block walls and columns course by course.
Stage 5Lintels and beams
Cast lintels over openings and ring beams.
Stage 6Roof structure
Fit the timber frame on the ring beam.
Stage 7Roofing and zinc
Fix sheets, ridge and flashing.
Stage 8Plumbing and electrical
Run conduits and pipes before plastering.
Stage 9Plastering
Render walls inside and out.
Stage 10Flooring and tiling
Screed, then lay tiles.
Stage 11Doors and windows
Fit frames, doors and glazing.
Stage 12Paint and finishing
Prime, paint and fit fixtures.
Stage 13Final inspection and handover
Check every stage and sign off.